Subject: Green light for preparations for reduced resolution operations Dear Bruno, Gaetan, Sven and fellow QWG colleages,I have good news on the QWG preparations for MIPAS operations.
The QWG activities proposed for reduced-resolution operations will require Envisat Steering Group approval. The Envisat Steering Group will address our case on 7July. I will contact the task leaders separately to convert the inputs received so far into a more formal proposal.
In view of the urgency of the activity, the Mission Manager has approved all activities up to a ceiling equivalent to all activities to be performed prior to the steering group date. Therefore we can start already now the QWG activity defined during the ACVE-2 meeting.
Note that it is confirmed that the resolution will be reduced to 62400 fringe counts ( sweeps duration has thus been reduced by 40.99% to 1.64 seconds) Iteration within the QWG has resulted in selection of a spectral grid of 0.0625 cm-1
The activities to be performed have been provided by the task leaders:
Level 1B: task leader Gaetan Perron
Level 2 : task leader Bruno Carli (plus Sven Bartha for ML2PP testing)
- formulation of proposal
- generation of recalibration and recharacterisation plan and schedule
- generation of New level 1 ADFs (v4.0) + documentation for new grid
- generation of test and reference data set (for tests by ASTRIUM and IFAC included below)
- defininition and impact assessment of new calibration resolution and scenario
- full optimisation, recharacterisation and recalibration (presumably this will be well after steering group meeting)
For the schedules of this activity, the original dates provided by Gaetan and Bruno are to be shifted by three weeks.
- formulation of proposal
- generation of reconfiguration plan and schedule
- Update of PreProcessor of ORM
- MWs for pT and H2O
- LUTs, IG and OM for pT and H2O
- MW, LUTs, IG and OM for other NRT products
- Revised NLTE error for NO2
- MW, LUTs, IG and OM for OL
- Test of ORM
- if needed: Modification of ML2PP (Sven Bartha)
- Creation of ADF for nom. scen. NRT and OL
- Tests for choice of optimum meas. scenarios (These are inputs to the dedicated scientific meeting on definition of new measurement scenarios)
- MW, LUTs, IG and OM for new measurement scenarios
- Creation of ADF for new meas. Scenarios
- Calculation of PT error propagation matrix
- Calculation of AK matrix
- End-to-end error assessment