MIPAS Operations have resumed today in Reduced-Resolution mode for a short interval of time. These operations will result in the usual gradual build-up of differential slide velocity anomalies, to a level that will make them visible during the brief (1 minute each) Back-up mode (single-slide) operations tests. The back-up mode tests will be performed immediately after the Orbit Control Manoeuvre (all other instruments off), on 21 September.